PROJECT REPORT

EV charging infrastructure, start to finish

The design, supply, installation and commissioning of EV charging infrastructure supporting the transition to clean, sustainable mobility — covering the electrical, civil and structural works required to make it reliable and future-ready.

01 / Project overview

One project, three work-streams

Every EV charging build we run covers electrical, civil and structural works together, so a site is genuinely reliable, safe and ready for the next generation of chargers — not just wired, but engineered.

02 / Scope of work

What’s inside every build

Design & Engineering

Layout planning, load analysis and 3D drawings that make every EV site build-ready.

Electrical & EV Infrastructure

Complete installations, power upgrades, lighting and 24/7 maintenance.

Civil Works

Site prep, foundations, road and pavement, trenching and drainage.

Shed Construction

Weatherproof, durable enclosures for charging bays and industrial use.

HT / LT / Compact Substation

Panels, switchgear and factory-built CSS units, self-manufactured LT panels.

Liaisoning & Approvals

DISCOM, electrical inspectorate and municipal clearances, handled end to end.

03 / Execution plan

Five phases, one handover

PH 01

Site survey & feasibility study

Assess the site, load requirements and access before a single drawing is finalised.

PH 02

Design finalisation & approvals

Lock the electrical, civil and shed design, then clear it with the relevant authorities.

PH 03

Procurement & material mobilisation

Source panels, cabling, structural material and shed components ahead of build.

PH 04

Installation & commissioning

Execute electrical, civil and structural works, then commission the system.

PH 05

Testing, training & handover

Verify performance, train the client’s team, and hand over a ready-to-run site.

04 / Case studies

Executing high-capacity transit infrastructure

Two depot-scale builds for interstate electric bus fleets — engineered for heavy-duty, continuous commercial use.

Patna Bus Depot

BIHAR

SITE CAPACITY

45 heavy-duty transit vehicles

TIMELINE TO COMMISIONING

90 days

POWER INTEGRATION

1.2 MW centralised grid

ENGINEERING FOCUS

High-stress structural canopies for continuous commercial workflow

Chandigarh Bus Depot

CHANDIGARH

SITE CAPACITY

60 interstate electric buses

HARDWARE MIX

120kW dual-gun DC fast chargers

POWER INTEGRATION

2.0 MW high-tension substation

ENGINEERING FOCUS

Ultra-efficient footprint maximising turning radius for heavy fleets

05 / Outcomes & benefits

What a finished site delivers

Scalable infrastructure

A safe, reliable EV charging site built to scale.

Cleaner energy

Contribution to clean energy adoption and carbon reduction.

Client growth

Enhanced client growth through sustainable solutions.

Future-ready

Infrastructure capable of supporting next-gen EV technology.

MEET THE PEOPLE

Behind every installation is an accountable team — engineers, designers, and site crews.