The design, supply, installation and commissioning of EV charging infrastructure supporting the transition to clean, sustainable mobility — covering the electrical, civil and structural works required to make it reliable and future-ready.
01 / Project overview
One project, three work-streams
Every EV charging build we run covers electrical, civil and structural works together, so a site is genuinely reliable, safe and ready for the next generation of chargers — not just wired, but engineered.
02 / Scope of work
What’s inside every build
Design & Engineering
Layout planning, load analysis and 3D drawings that make every EV site build-ready.
Electrical & EV Infrastructure
Complete installations, power upgrades, lighting and 24/7 maintenance.
Civil Works
Site prep, foundations, road and pavement, trenching and drainage.
Shed Construction
Weatherproof, durable enclosures for charging bays and industrial use.
HT / LT / Compact Substation
Panels, switchgear and factory-built CSS units, self-manufactured LT panels.
Liaisoning & Approvals
DISCOM, electrical inspectorate and municipal clearances, handled end to end.
03 / Execution plan
Five phases, one handover
PH 01
Site survey & feasibility study
Assess the site, load requirements and access before a single drawing is finalised.
PH 02
Design finalisation & approvals
Lock the electrical, civil and shed design, then clear it with the relevant authorities.
PH 03
Procurement & material mobilisation
Source panels, cabling, structural material and shed components ahead of build.
PH 04
Installation & commissioning
Execute electrical, civil and structural works, then commission the system.
PH 05
Testing, training & handover
Verify performance, train the client’s team, and hand over a ready-to-run site.
04 / Case studies
Executing high-capacity transit infrastructure
Two depot-scale builds for interstate electric bus fleets — engineered for heavy-duty, continuous commercial use.
Patna Bus Depot
BIHAR
SITE CAPACITY
45 heavy-duty transit vehicles
TIMELINE TO COMMISIONING
90 days
POWER INTEGRATION
1.2 MW centralised grid
ENGINEERING FOCUS
High-stress structural canopies for continuous commercial workflow
Chandigarh Bus Depot
CHANDIGARH
SITE CAPACITY
60 interstate electric buses
HARDWARE MIX
120kW dual-gun DC fast chargers
POWER INTEGRATION
2.0 MW high-tension substation
ENGINEERING FOCUS
Ultra-efficient footprint maximising turning radius for heavy fleets
05 / Outcomes & benefits
What a finished site delivers
Scalable infrastructure
A safe, reliable EV charging site built to scale.
Cleaner energy
Contribution to clean energy adoption and carbon reduction.
Client growth
Enhanced client growth through sustainable solutions.
Future-ready
Infrastructure capable of supporting next-gen EV technology.